Back to Testing Impact Lab
Manage lab data
Synthetic demo data, saved in this browser only. Reset demo on the lab page restores the original fixture.
Test cases (15)
| Test case | Author | Owner | Status | Mapped touch points | |
|---|---|---|---|---|---|
TC-101 End to end maintenance workflow | Sam Patel | Owner not confirmed | Approved | 7 | |
TC-102 Create engineering work order with MOC | Lee Chen | Fatima | Approved | 2 | |
TC-103 Engineering work order with asset update | Lee Chen | Deborah | Draft | 2 | |
TC-104 Purchase requisition approval — standard limit | Ana Ruiz | Judy | Approved | 2 | |
TC-105 Purchase requisition approval — over limit | Ana Ruiz | Judy | Approved | 2 | |
TC-106 Engineering change with work order status update | Sam Patel | Deborah | Archived | 3 | |
TC-107 Purchase requisition from work order | Sam Patel | Michael | Approved | 2 | |
TC-108 Engineering work order sent to ERP | Lee Chen | Owner not confirmed | Approved | 2 | |
TC-109 Route work order to planning | Sam Patel | Michael | Approved | 2 | |
TC-110 Close work order with costs | Sam Patel | Michael | Approved | 2 | |
TC-111 Update purchase order and receive | Ana Ruiz | Judy | Approved | 2 | |
TC-112 Partial receipt and return | Ana Ruiz | Judy | Approved | 1 | |
TC-113 GL account validation on cost lines | Lee Chen | Owner not confirmed | Approved | 2 | |
TC-114 New user role audit | Sam Patel | Michael | Draft | 1 | |
TC-115 Calibration during operator rounds | Lee Chen | Owner not confirmed | Approved | 2 |
Process touch points
Groups are fixed to match the BQS map. Add, rename or delete the touch points inside them.